Erection, testing and commissioning
EHV and HV substations, support structures, HT/LT cables and overhead lines, panels, DG sets, earthing, lightning arrestors and SCADA.
Former MSEDCL engineers with more than 35 years in electricity distribution. We get your load sanctioned, your installation built and licensed, and your electricity bill under control, anywhere in Maharashtra.
Save energy. Save money.
One team for the engineering, the approvals and the savings. Choose a single service or hand over your whole electrical installation.
EHV and HV substations, support structures, HT/LT cables and overhead lines, panels, DG sets, earthing, lightning arrestors and SCADA.
New HT and LT load from the electricity company or PWD, including multi-party sanctions, with every document and follow-up handled.
Approvals from the electrical inspector for transformers, high-rise buildings, lifts, escalators and DG sets.
Bill studies that claim every incentive, correct wrong tariffs, recover refunds and resolve disputes, including Section 126 cases.
Read moreRight-sized capacitor banks with 24x7 support, aiming for power factor close to unity within two months.
Audits that measure where energy and money are lost, and a costed plan with savings and payback for every measure.
Read moreBuying cheaper solar or wind power over the grid: eligibility, landed-cost comparison, approvals and monthly settlement.
Read moreHazard inspections, compliance checks, annual maintenance schedules, earthing tests, and calibration of CTs, PTs, relays and meters.
Solar PV systems designed to cut rising electricity bills, with net-metering support.
Read moreOpen access lets you buy electricity from a generator of your choice, usually a solar or wind project, and have it delivered to your premises over the transmission and distribution network. For many HT consumers the landed cost of open access power is well below the grid tariff, which makes it one of the largest cost levers available.
Consumers with a contract demand or sanctioned load of 100 kW or more. Several connections in the same electricity circle can be added together to reach 100 kW.
Larger consumers can buy power through conventional open access from 1 MW of contract demand.
Captive arrangements have no minimum load, and consumers with rooftop solar can use open access at the same time.
These charges change with each MERC tariff order, and the rules on banking have been under challenge in court. We work out the numbers on the rules in force when you decide, not on last year's figures.
We study 12 months of your bills and compare today's grid cost with the full landed cost of open access, charge by charge.
Captive, group captive or third-party purchase: we compare them and review the power purchase agreement before you sign.
We prepare and follow up the open access application, connectivity and metering requirements with the utility and the nodal agency.
Every month we check energy accounting, banking and the open access credits on your bill, so savings are not lost to errors.
An energy audit measures where your electricity goes and where money is being lost, then gives you a costed plan. Many of the biggest savings need little or no investment, because they come from how you are billed rather than from new equipment.
Demand charges are a fixed monthly cost linked to your contract demand and recorded maximum demand. We check whether your contract demand is too high and how to control peaks.
Little or no investmentUnder the ToD tariff, consumption between 09:00 and 17:00 earns a rebate, while evening peak hours cost extra. Moving flexible loads such as pumping, charging and batch processes saves money directly.
Little or no investmentHT consumers are billed on kVAh, so every point of power factor lost is paid for. Correct capacitor banks and harmonic filters bring billed units down.
Short paybackWrong categories, wrong multiplying factors and missed incentives quietly add to bills. We check them line by line and pursue refunds.
Recovers past overpaymentsVariable speed drives, correctly sized motors and fixing compressed-air leaks reduce the largest running loads in most plants.
Investment with measurable paybackLightly loaded transformers, long LT cables and poor joints waste energy continuously. We measure losses and suggest practical fixes.
Investment with measurable paybackLED fittings, controls and better air-conditioning settings cut consumption in offices, malls, hospitals and societies.
Short paybackOnce waste is removed, we size rooftop solar or open access to the load that remains, so you do not over-invest.
Long-term cost reductionThe audit also flags earthing, protection and statutory issues that can lead to penalties, breakdowns or accidents.
Avoids penalties and downtimeTwelve months of bills: demand, ToD split, power factor, incentives, penalties and tariff category.
We walk the site and log the main incomer and key feeders with a power analyser to see how load really behaves.
Each measure comes with the investment needed, the annual saving and the payback period, in priority order.
We carry out or supervise the work, then compare bills before and after to confirm the saving.
Designated consumers under the Energy Conservation Act, 2001 must also have periodic mandatory audits by an accredited energy auditor. We help you prepare for them and act on their findings.
| Measure | Investment | Annual saving | Payback |
|---|---|---|---|
| Reduce contract demand | Nil | From your bills | Immediate |
| Shift loads to solar hours | Nil to low | From your ToD data | Immediate |
| Capacitor bank and filters | Quoted | Calculated | Calculated |
| VFDs on pumps and fans | Quoted | Calculated | Calculated |
| Rooftop solar or open access | Quoted | Calculated | Calculated |
Enter figures from your own electricity bill and any offer you have received. The starting values are only examples.
These two measures usually need little or no investment. Our audit confirms the actual figures from your meter data.
Estimates only, before GST and electricity duty. Actual savings depend on the MERC tariff order in force, your tariff category, your load profile and the terms of any agreement. Ask us for a detailed study.
We study the energy bills of energy-intensive consumers and show you which incentives you are missing, which penalties you can avoid, and whether you are on the right tariff category. For power factor improvement we can work on a profit-sharing basis.
Power factor shows how much of the power you draw does useful work. Raising it means less current, cooler cables, longer equipment life and lower losses, and it earns an incentive instead of a penalty.
| Lever | What applies | Effect |
|---|---|---|
| Power factor | HT consumers are billed in kVAh, so a low power factor directly adds to billed units | Direct saving |
| Prompt payment | Discount of 1% for paying on time | Discount |
| EHV supply | Rebate of 3% for consumers supplied at EHV | Rebate |
| Load factor | Incentive of up to 15% for a high load factor | Incentive |
| Time of day (ToD) | Rebate for consumption in solar hours (09:00 to 17:00); extra charge in evening peak hours | Rebate or surcharge |
| Delayed payment | Interest of up to 18% a year on late payment | Penalty |
| Tariff category | Being billed under the wrong category | Risk |
A straightforward process, from the first visit to long-term support.
We come to your factory, premises or society and meet your team.
We review your electrical system and your recent energy bills.
You get clear recommendations, with costs and expected savings.
We install, test and commission, and handle the approvals.
We keep an eye on the installation so problems are caught early.
Net metering and supportive state policies make solar a practical way to cut rising electricity bills. We specialise in rooftop projects for individual consumers, and we also build ground-mounted plants, from design to grid connection.
Ask about solar for your siteLaying of overhead lines at Osmanabad.
Regular and multi-party sanctions, including Sadbhav Engineering, Vidani Textiles and Glomax Mall.
Load reduction, tariff change and related work.
Billing penalties and load reduction for NMMC, CIDCO, BEST and PWD; load sanction and tariff change for Reliance Jio.
MSEDCL, NMMC, CIDCO, BEST
Deepak Fertilisers, IOTL, SPS International, WF India, Sound Casting, Royalfoods Stuff, Himadri Foods, Sharayu Agro Industries, Ashan Colour Coat, Precihole Sports
Reliance Jio Infocomm, ICICI Bank, KFC India, BVG India, Glomax Mall, Bhoomi Mall, Adlabs Imagica, Sharayu Hyundai
MGM Hospital, Indian Institute of Marine Engineers, B.P. Marine Institute, Grasisa Institute (Aditya Birla Group), Navi Mumbai Sports Association
EV Homes Constructions, Akshar Builders, Arihant Paradise
Our principals spent their careers at MSEDCL. They know how applications are assessed, how tariffs are applied and where bills go wrong.
B.E. (Electrical), M.E. (Control). Former Chief Engineer, MSEDCL.
B.E. (Electrical). Former Executive Engineer, MSEDCL.
+91 86520 16401Quick answers about load sanction, bills, power factor and solar. You can also ask our assistant.
We cover the full power-supply lifecycle for HT, EHV and LT consumers: erection, testing and commissioning of substations, cables, panels, DG sets and earthing; load sanction and safety licences; tariff and billing consultancy; open access advisory, energy audits and power factor correction; inspection and maintenance; and rooftop and ground-mounted solar.
We handle the whole process of obtaining HT or LT load from the electricity company or PWD: preparing the application and documents, arranging site visits and permissions, and following up until the load is released. We have secured regular and multi-party load sanctions for more than 100 consumers.
In most cases, yes. We study your energy bills and look for incentives and rebates you are not claiming (load factor, prompt payment, solar-hour ToD rebate, EHV rebate), penalties you can avoid, and whether you are billed under the right tariff category. We have helped more than 50 HT consumers with load reduction and tariff change.
Power factor shows how much of the power you draw does useful work. HT consumers are billed in kVAh, so a low power factor directly increases the units you pay for, and also means more current, hotter cables and higher losses. We size and install the right capacitor banks with 24x7 support, and aim to bring your power factor close to unity within two months. We can also work on a profit-sharing model.
Yes. We resolve billing disputes, including Section 126 assessment cases under the Electricity Act, 2003. We also prepare and follow up proposals for refund of electricity duty and security deposit, and for correction of wrong billing or wrong tariff category.
Open access lets you buy electricity from a generator of your choice, usually solar or wind, and have it delivered over the grid. You pay the generator tariff plus transmission and wheeling charges, surcharges and losses. For many HT consumers this landed cost is well below the grid tariff. We compare the two from your bills, choose the right model (captive, group captive or third party), handle approvals and check the monthly settlement. Try the savings estimator.
In Maharashtra, green energy open access is available to consumers with a contract demand or sanctioned load of 100 kW or more, and several connections in the same electricity circle can be added together to reach that. Conventional open access starts at 1 MW, and captive arrangements have no minimum. Rooftop solar and open access can be used together.
We analyse 12 months of bills, survey the site, log the main feeders with a power analyser, and give you a report where every measure has its investment, annual saving and payback. Savings vary by site, so we calculate them from your own data. The quickest wins usually need little or no investment: right-sizing contract demand, shifting load into solar hours, correcting power factor and fixing billing errors. See the energy audit section.
Under the current MSEDCL time-of-day structure, consumption during solar hours (09:00 to 17:00) earns a rebate, while evening peak hours cost extra. Moving flexible loads such as pumping, charging and batch processes into the day can reduce your bill with little or no investment. Rates change with each MERC tariff order, so we check them against your bill.
Yes. We specialise in rooftop solar for individual consumers and also build ground-mounted plants. Recent work includes 3 MW at Sangola, 2.5 MW at Yavat and 1.5 MW at Warora, plus rooftop systems of 100 to 350 kW. With net metering, surplus solar power can be adjusted against your bill.
Yes. We obtain electrical safety licences from the electrical inspector for transformers, high-rise buildings, lifts, escalators and DG sets, and arrange the site visits and permissions needed for installation and erection.
Yes. We inspect transformers, cables and distribution boxes for hazards, verify statutory compliance, prepare annual maintenance schedules with history cards, carry out preventive maintenance, test earthing, and test and calibrate CTs, PTs, relays and meters with certificates.
Yes. We carry out erection, testing and commissioning of EHV and HV substations and their support structures, HT/LT cable laying and overhead lines, HT/LT panels, DG sets, low-side works, earthing, lightning arrestors for high-rise buildings, and SCADA automation.
Our office is at Seawoods, Navi Mumbai, and we work across Maharashtra, with projects in Navi Mumbai, Mumbai, Thane, Raigad, Pune, Satara, Kolhapur, Solapur, Akola and Chandrapur.
The firm is led by Suresh Ganeshkar, former Chief Engineer at MSEDCL, and Vijaykumar Kamanna, former Executive Engineer at MSEDCL. They are supported by senior electrical engineers and specialists in supply chain, accounts, HR and IT, with more than 35 years of combined experience in electricity distribution.
Clients include MSEDCL, NMMC, CIDCO, BEST, Reliance Jio, ICICI Bank, KFC India, Deepak Fertilisers, MGM Hospital, Glomax Mall, Adlabs Imagica and EV Homes, among others. We also laid overhead lines for Adani Projects at Osmanabad.
It depends on the scope, so we quote after understanding your requirement, and we keep our fees reasonable. For power factor improvement we can also work on a profit-sharing basis. Share your latest bills or project details for a quote.
Call Vijaykumar Kamanna on +91 86520 16401 or email vkamanna@gmail.com. It helps to have your last few electricity bills ready. You can also use the enquiry form.
Tell us about your site or share your last few electricity bills. We will visit, study your electrical system and show you where you can save.